Nyamaya DOK School Mission 2026

Mission Complete — The Full Photo Story

The Nyamaya DOK Comprehensive School mission is now complete. Below is the full picture: the mission day album, the before and after views, and every progress photo taken along the way. Browse them, view any photo full screen and download the ones you would like to keep.

Mission concluded — 15 September 2026

Classroom finishing, painting, roofing, lighting, litter bins, learner desks and teachers’ furniture were all delivered and handed over. Thank you to every giver, partner and volunteer. This page stays online as the mission record until our next mission is announced.

Mission Day Album

Handover Day at Nyamaya — 38 Photos

Photos from the final mission day: the dedication, the parents and teachers, the CFA team and the learners in their renewed classrooms. This album loads straight from our shared mission photo folder, so newly added photos appear here on their own. Click a photo to view it full screen, or use the download button on any photo to save it.

The Change

Before and After, Side by Side

On the left, the classrooms as we found them. On the right, the same spaces after repairs, roofing, paintwork and new furniture. Tap any photo to view it full size.

Before

8 photos
Worn classroom block with broken desks stacked on the veranda
Before: worn classroom block and broken desks
Grade 1 classroom block before renovation
Before: Grade 1 block awaiting repair
Old plastic container tied to a tree serving as a makeshift dustbin
Before: improvised dustbin made from a plastic container
Worn yellow and white container tied to a tree as a dustbin
Before: old container used as a dustbin near the classroom block
Improvised dustbin hanging from a tree beside the school building
Before: makeshift dustbin before the new bins arrived
Classroom with old worn wooden benches and desks
Before: worn benches in an empty classroom
Learners in blue uniforms sharing crowded wooden desks
Before: learners sharing crowded desks
Pupils peeking through a broken classroom window frame
Before: broken window frames and classrooms

After

12 photos
Completed blue and cream painted classroom corridor
Completed corridor in school colours
Freshly painted Grade 3 classroom exterior
After: Grade 3 classroom refreshed
Repainted classroom block exterior with new gutters
After: repainted block and new guttering
Completed Grade block with the gold Nyamaya DOK School Mission 2026 plaque
Latest: finished block with the mission plaque installed
Grade 1 classroom entrance with fresh paint and new blue door
Latest: Grade 1 classroom entrance refurbished
Side view of the repainted Grade 1 block with new gutters
Latest: Grade 1 block with new gutters and paint
Refurbished classroom corridor with blue pillars and window grilles
Latest: corridor finishing with blue pillars and windows
Yellow push-top waste bin placed beside a classroom pillar
Latest: new colour-coded waste bin in place
Educational wall charts for maths, shapes and body parts in a classroom
Latest: learning charts mounted on classroom walls
Classroom block with gold plaque and blue trim
Latest: mission plaque on the completed block
Classroom with rows of varnished wooden desks and benches
Latest: varnished desks and benches arranged in class
Classroom with new wooden desks, benches and blackboard
Latest: furnished classroom ready for learners

Full Archive

All Mission Photos

85 photos and counting. Filter by stage to follow the work day by day.

Worn classroom block with broken desks stacked on the verandaBefore
Before: worn classroom block and broken desks
Grade 1 classroom block before renovationBefore
Before: Grade 1 block awaiting repair
Old plastic container tied to a tree serving as a makeshift dustbinBefore
Before: improvised dustbin made from a plastic container
Worn yellow and white container tied to a tree as a dustbinBefore
Before: old container used as a dustbin near the classroom block
Improvised dustbin hanging from a tree beside the school buildingBefore
Before: makeshift dustbin before the new bins arrived
CFA team member assessing classroom windows during a site surveyProgress
Site survey and needs assessment
Freshly screeded and sealed classroom veranda floorProgress
Veranda floors repaired and sealed
Workman preparing classroom walls for paintingProgress
Wall preparation and priming
Learner standing in a refurbished classroom corridorProgress
Corridor works in progress
Painted blue and cream classroom corridor with supervisor inspectingProgress
Painting underway on the classroom block
Completed blue and cream painted classroom corridorAfter
Completed corridor in school colours
Freshly painted Grade 3 classroom exteriorAfter
After: Grade 3 classroom refreshed
Repainted classroom block exterior with new guttersAfter
After: repainted block and new guttering
Classroom with old worn wooden benches and desksDesks
Before: worn benches in an empty classroom
Learners in blue uniforms sharing crowded wooden desksDesks
Before: learners sharing crowded desks
Pupils peeking through a broken classroom window frameDesks
Before: broken window frames and classrooms
Carpenter assembling a new wooden desk in the workshopDesks
New desks under construction
Completed desk frame standing in the carpentry workshopDesks
Desk frame completed at the workshop
New desk and matching bench set assembled in the workshopDesks
Desk and bench sets taking shape
Two finished desk and bench units in the workshopDesks
Finished desk and bench units ready for delivery
Mason plastering a new concrete apron beside the classroom block28 Aug Update
28 Aug: mason casting the new concrete apron
Freshly cast concrete apron and foundation works along the classroom wall28 Aug Update
28 Aug: apron and foundation works around Grade blocks
Classroom corner with new blue pillar paint and fresh cement plinth28 Aug Update
28 Aug: plinth plastering and pillar painting
Repainted classroom block with cream walls, blue and maroon pillars28 Aug Update
28 Aug: block repainted in school colours
Repainted veranda with refurbished window frames open along the corridor28 Aug Update
28 Aug: window frames refurbished along the veranda
Grade 3 classroom exterior freshly painted blue, cream and maroon28 Aug Update
28 Aug: Grade 3 classroom completed
Newly finished black chalkboard on a cream classroom wall with red skirting31 Aug Update
31 Aug: new chalkboard installed and finished
Second refurbished classroom chalkboard with fresh cream walls31 Aug Update
31 Aug: second classroom chalkboard completed
Completed classroom block with blue roof, cream walls and maroon skirting31 Aug Update
31 Aug: classroom block complete with new roof and paint
Painter working along a repainted classroom veranda with pupils passing by31 Aug Update
31 Aug: veranda painting continues
Repainted classroom entrance with new blue door and maroon plinth31 Aug Update
31 Aug: new doors and plinth finishing
Grade 1 classroom doorway repainted with fresh blue metal door31 Aug Update
31 Aug: Grade 1 block refurbished
Worker rolling cream paint onto a classroom gable end31 Aug Update
31 Aug: gable ends being painted
Corridor with old window frames awaiting refurbishment beside repainted pillars31 Aug Update
31 Aug: window frames awaiting refurbishment
Freshly cast maroon concrete apron along the classroom foundation31 Aug Update
31 Aug: concrete apron cast and painted
Workers repairing classroom window frames from paint buckets31 Aug Update
31 Aug: window repair works underway
Classroom block with new sky-blue iron roof, cream walls and maroon skirting31 Aug Evening
31 Aug: new roofing sheets and full repaint complete
Repainted classroom veranda with new gutters and completed concrete apron31 Aug Evening
31 Aug: veranda, gutters and apron finished
Finished walkway between classroom blocks with painted pillars31 Aug Evening
31 Aug: walkway between blocks completed
Long covered corridor with fresh paint and smooth floor screed31 Aug Evening
31 Aug: corridor screed and paint complete
Grade 1 entrance with repainted walls and refurbished blue door31 Aug Evening
31 Aug: Grade 1 entrance refurbished
Grade 3 classroom wall painted blue and cream with refurbished windows31 Aug Evening
31 Aug: Grade 3 walls and windows finished
View of the new blue roof from the repainted classroom veranda31 Aug Evening
31 Aug: new roof over the renovated block
Carpenter assembling new desks and benches at the workshop31 Aug Evening
31 Aug: carpentry team assembling new desks
Batch of newly built wooden desks and benches ready for the school31 Aug Evening
31 Aug: batch of new desks completed
Finished desk and bench set standing outside the workshop31 Aug Evening
31 Aug: finished desk and bench set
Painter refurbishing classroom window frames on a repainted block with blue pillars1 Sept Update
1 Sept: window frames being repainted on the finished block
Front elevation of the classroom block with cream walls, blue pillars and maroon plinth1 Sept Update
1 Sept: block front elevation nearing completion
Painter brushing light blue paint onto a large classroom window frame1 Sept Update
1 Sept: window frames getting their final coat
Worker painting a veranda pillar deep blue along the classroom corridor1 Sept Update
1 Sept: veranda pillars painted deep blue
Corridor with freshly painted blue pillars, cream walls and pink plinth1 Sept Update
1 Sept: corridor pillars and plinth finished
Pupils sweeping a freshly screeded and polished classroom floor1 Sept Update
1 Sept: pupils cleaning the newly finished classroom floor
Completed classroom block with cream walls, blue trim and maroon plinth at dusk2 Sept Update
2 Sept: completed classroom block exterior
Side view of the finished classroom block with new roof and painted gable2 Sept Update
2 Sept: finished gable and roofline
Grade 1 veranda with painted pillars, blue door and maroon plinth2 Sept Update
2 Sept: Grade 1 veranda complete
Classroom entrance under a new blue iron roof with painted door and windows2 Sept Update
2 Sept: new blue roof and painted entrance
Row of refurbished classroom windows with light blue frames and red sills2 Sept Update
2 Sept: refurbished window frames and sills
Repainted classroom facade with blue pillars and pink plinth2 Sept Update
2 Sept: repainted facade along the corridor
Close view of freshly painted classroom windows and plastered plinth2 Sept Update
2 Sept: window and plinth finishing
Newly varnished wooden desk and bench set drying outside2 Sept Update
2 Sept: new desks varnished and drying
Finished school desk with attached bench in bright wood finish2 Sept Update
2 Sept: finished desk and bench set
Pair of completed desks stacked beside the carpentry workshop2 Sept Update
2 Sept: completed desks ready for delivery
Classroom filled with rows of newly varnished reddish-brown learner desks7 Sept Update
7 Sept: learner desks varnished and placed in classroom
Newly varnished desks and teacher chairs arranged in a freshly painted classroom7 Sept Update
7 Sept: teacher furniture and learner desks in place
Rows of varnished wooden desks in a classroom with a pupil seated nearby7 Sept Update
7 Sept: classroom desks ready for learners
Two long teacher desks with cushioned chairs against a classroom wall7 Sept Update
7 Sept: new teacher desks and chairs installed
Teacher desks and cushioned chairs beside a blackboard in a finished classroom7 Sept Update
7 Sept: teacher furniture set up at the front of class
Colourful push-top waste bins labelled The Christ Nyamaya DOK School Mission 202610 Sept Update
10 Sept: new waste bins for a cleaner school environment
Green, yellow, blue and red bins stacked and ready for placement10 Sept Update
10 Sept: colour-coded bins to keep classrooms and corridors tidy
Push-top bins in blue, red, green and yellow lined up on the veranda10 Sept Update
10 Sept: waste bins prepared for the school compound
Worker installing a new ceiling light fitting in a classroom10 Sept Update
10 Sept: new lighting being installed in classrooms
Worker securing a light fitting to the classroom roof truss10 Sept Update
10 Sept: light fittings mounted on the roof structure
Newly installed oval ceiling light under the corrugated roof10 Sept Update
10 Sept: classroom ceiling light installed and working
Bright LED ceiling light glowing under the classroom roof trusses10 Sept Update
10 Sept: new LED light illuminating the classroom
Oval ceiling light fitted among wooden roof trusses10 Sept Update
10 Sept: roof truss wiring and light fitting complete
Close-up of the new ceiling light mounted on the wooden truss10 Sept Update
10 Sept: lighting fixture securely fixed in place
Completed Grade block with the gold Nyamaya DOK School Mission 2026 plaqueLatest Update
Latest: finished block with the mission plaque installed
Grade 1 classroom entrance with fresh paint and new blue doorLatest Update
Latest: Grade 1 classroom entrance refurbished
Side view of the repainted Grade 1 block with new guttersLatest Update
Latest: Grade 1 block with new gutters and paint
Refurbished classroom corridor with blue pillars and window grillesLatest Update
Latest: corridor finishing with blue pillars and windows
Yellow push-top waste bin placed beside a classroom pillarLatest Update
Latest: new colour-coded waste bin in place
Educational wall charts for maths, shapes and body parts in a classroomLatest Update
Latest: learning charts mounted on classroom walls
Classroom block with gold plaque and blue trimLatest Update
Latest: mission plaque on the completed block
Classroom with rows of varnished wooden desks and benchesLatest Update
Latest: varnished desks and benches arranged in class
Classroom with new wooden desks, benches and blackboardLatest Update
Latest: furnished classroom ready for learners